Amentum selected by US DOE for Savannah River Site AI data center, energy generation project talks
AMTM•DOE selects Amentum for Savannah River Site project talks
Amentum selected by the DOE’s NNSA to enter negotiations for a phased lease at the Savannah River Site in South Carolina.
- Project targets a 1-gigawatt AI data center supported by about 2 gigawatts of on-site power generation.
- Power plan starts with natural gas, then transitions to advanced nuclear energy.




