Artemis Gold reports Q3 2026 production results in line with guidance
Artemis Gold’s Blackwater produced 69,546 ounces of gold in Q3 2026, up 14% from Q3 2025. The Phase 1A expansion is 77% complete and remains on track for completion in Q4.
1. Production and expansion
Blackwater produced 69,546 ounces of gold in Q3 2026, up 14% from the same quarter in 2025. Artemis Gold said the Phase 1A expansion, which will increase annual design throughput by 33% to 8 million tonnes per year, is 77% complete and on track for completion in Q4. The company expects its expansions to triple capacity and annual gold production to exceed 500,000 ounces in 2029.





