Baker Hughes wins power generation order from major US technology company
BKR•Baker Hughes announced power generation and cooling orders from a major U.S. technology company, with equipment expected to provide approximately 1.1 GW for AI workloads. The orders include 34 Frame 5 gas turbines, nine NovaLT16 turbines and cooling equipment; the power order was booked in the third quarter of 2026 and the cooling order in the fourth quarter.
1. Equipment orders
Baker Hughes announced power generation and cooling orders on Oct. 27, 2026, from a major U.S. technology company. The power equipment will provide approximately 1.1 GW for high-performance computing supporting AI training, inference and physical AI workloads. The award includes 34 Frame 5 gas turbines, nine NovaLT16 turbines, BRUSH generators and associated gears, as well as Chart dry coolers for a closed-loop cooling system.
2. Order timing
The power generation order was booked in the third quarter of 2026, while the cooling order was booked in the fourth quarter.




