Buenaventura forecasts 2026 gold output at 150,300-172,500 oz including associates
BVN•Base-metals guidance maintained
Base-metals guidance was kept at 48,000-53,000 tonnes copper, 18,500-20,800 tonnes lead, and 28,600-31,800 tonnes zinc; 2Q26 output was 13,475, 3,642, and 7,360 tonnes.
Silver guidance and second-quarter output
Silver outlook was set at 14.2-15.6 million oz including associates; 2Q26 silver production was 3.52 million oz, driven by Yumpag at 2.32 million oz.
Direct silver guidance was set at 14.7-16.1 million oz; 2Q26 direct production was 3.62 million oz.
2026 production outlook updated
Buenaventura updated its 2026 production outlook, signaling 150,300-172,500 oz of gold including associates; 2Q26 output was 37,266 oz.
Direct gold guidance was set at 120,000-139,000 oz; 2Q26 direct production totaled , led by at .



