Collective Mining drills 38 m at 15.46 g/t gold equivalent, extending Apollo breccia at Guayabales project
CNL•Cash position and 2026 drilling plan
Cash totaled US$93.7 million at June 30, 2026, funding a 2026 plan for up to 90,000 m of drilling.
Apollo breccia extended with high-grade drilling results
Collective Mining reported a new, high-grade northern extension to the Apollo breccia at its Guayabales Project in Caldas, Colombia.
Directional hole APC172-D2 hit 141.4 m at 4.88 g/t AuEq from 924 m depth, including 38 m at 15.46 g/t AuEq.
Hole APC172-D1 returned 97.15 m at 1.06 g/t AuEq from 929 m depth.
Results extend Apollo about 100 m north along strike, adding about 170 m of vertical depth extension; mineralization remains open east, west, deeper.




