Consolidated Water unit wins $39.8 million Pismo Beach water-treatment design-build contract
CWCO•Consolidated Water’s PERC Water won a design-build agreement from Pismo Beach, California, valued at about $39.8 million. The project includes an advanced water purification facility sized to produce about 750 acre-feet annually, with work expected to take about 24 months and construction targeted for spring 2027.
1. Contract details
PERC Water’s agreement covers design, construction, testing, staff training and support for initial operations of the facility. The project aims to provide a drought-resistant local water supply and reduce seawater intrusion risk.



