Energy Vault places 275 MW power systems order with 2G Energy for US AI data center projects
NRGV•275 MW order for modular power generation systems
Energy Vault awarded 2G Energy a 275 MW order to supply modular power generation systems for US AI and data center energy projects.
The equipment is intended to support Energy Vault’s powered land and powered shell offerings, integrating on-site generation with battery storage, power conversion and VaultOS controls.
Deliveries are scheduled from Q4 2027 through Q3 2028, based on current project planning.
The order also includes commissioning services and long-term service support for the generation fleet.




