ExxonMobil starts production at Uaru, raising Guyana capacity to 1.1 million barrels per day
XOM•ExxonMobil started production at the Uaru project, raising Guyana’s installed capacity to 1.1 million barrels per day. The Errea Wittu FPSO has capacity of 250,000 barrels per day and is expected to reach that level in the first quarter of 2027.
1. Uaru production begins
ExxonMobil started production at Uaru, raising Guyana’s installed capacity to 1.1 million barrels per day. The Errea Wittu FPSO has capacity of 250,000 barrels per day and is expected to reach that level in the first quarter of 2027.




