F4 Uranium Launches EM Survey at Murphy Lake Targeting 0.242% U₃O₈ Zone

CCJCCJ

F4 Uranium has begun a partner-funded ground EM survey on its 609 ha Murphy Lake Property, targeting high-priority northern lines near drill hole ML22-012 following intercepts of 56 ppm U over 0.5 m and 0.242% U₃O₈ over 4.2 m. UraniumX will fund the program to earn up to 70% interest.

1. Program Launch

F4 Uranium has mobilized a ground EM geophysics crew to its 609-hectare Murphy Lake Property in the northeastern Athabasca Basin. The survey focuses on high-priority northern lines near historic drill hole ML22-012, aiming to delineate conductive corridors for uranium mineralization.

2. Historical Drill Results

Drill hole ML22-012 intersected 56 ppm U over 0.5 m in sandstone above the Athabasca unconformity, while nearby hole ML22-006 returned 0.242% U₃O₈ over 4.2 m in basement rocks. These results highlight potential extensions of the north-south conductive corridor.

3. Option Agreement Funding

UraniumX Discovery Corp. is fully funding the geophysics program under an option agreement that allows it to earn up to a 70% interest in the Murphy Lake Property. F4 Uranium acts as operator during the earn-in period.

4. Drill Campaign Timeline

EM results will be integrated into the project model as data are received, guiding the late spring 2026 drill program. The new data aims to refine target selection and optimize drilling efficiency.

Sources

F
F4 Uranium Launches EM Survey at Murphy Lake Targeting 0.242% U₃O₈ Zone - CCJ News | Rallies