First Solar announces availability of 2026 Corporate Responsibility Report
FSLR•Report availability and sustainability metrics
First Solar announced the availability of its 2026 Corporate Responsibility Report at https://www.firstsolar.com/Responsible-Solar/CRR.
- University of Louisiana at Lafayette study: nearly 30,000 U.S. jobs supported in 2025; USD 3 billion labor income; USD 5.8 billion GDP contribution.
- Study projection for 2027: more than 39,000 jobs; USD 4 billion labor income.
- Exited 2025 with almost 13 GW U.S. nameplate capacity; targets about 17 GW by 2027; expects over USD 5 billion invested since 2019 by end-2026.
- Average material recovery rate exceeded 95% in 2025; South Carolina plant phase one expected to start in 2H 2026.




