Fortuna Mining hits 7.8 g/t gold over 12.8 meters at Diamba Sud
FSM•Fortuna Mining reported 7.8 g/t gold over an estimated true width of 12.8 meters at its Diamba Sud Gold Project in Senegal. Its 2026 drilling campaign targets 51,000 meters with six rigs and an $8 million budget.
1. Drill results and campaign
Fortuna Mining reported new drill results at Diamba Sud, extending mineralization beyond current pit designs. At Southern Arc, hole DSR1128 returned 7.8 g/t gold over an estimated true width of 12.8 meters from 103 meters; hole DSR1149 returned 3.9 g/t over 40.8 meters from 228 meters. Kassasoko drilling also extended mineralization, which remains open at depth and along strike. Drilling has started at Kabewest, as Fortuna targets 51,000 meters in an $8 million 2026 campaign with six rigs.




