Fortuna Mining posts Q3 2026 production of 69,665 gold equivalent ounces
FSM•Fortuna Mining reported Q3 2026 production of 69,665 gold equivalent ounces, down 3.53% from Q2; nine-month output totaled 214,754 ounces. Its board sanctioned a $109 million Séguéla plant expansion targeting annual capacity of 2.3 million tonnes and production of more than 200,000 ounces from the second half of 2028.
1. Quarterly production
Fortuna Mining posted Q3 2026 production of 69,665 gold equivalent ounces, down 3.53% from 72,217 in Q2. Séguéla produced 33,744 ounces, down 19.05%, with lower head grade and recovery weighing on results. Lindero produced 26,024 ounces, up 24.94%, while Caylloma output rose 1.98% to 9,897 gold equivalent ounces. Caylloma silver production climbed 6.95% to 247,367 ounces.
2. Séguéla expansion
The board sanctioned a $109 million expansion of the Séguéla plant to 2.3 million tonnes of annual capacity. The project targets production of more than 200,000 ounces from the second half of 2028.




