Frontier Nuclear launches 36,000-meter drilling program at Pine Ridge uranium project in Wyoming
FNUC•Claim block expanded ahead of program
The claim block was expanded by 54 federal mining claims covering about 854 acres ahead of the 2026 program.
Work aimed at maiden resource estimate
The work aims to support a maiden mineral resource estimate by early 2027, following 2025 drilling that outlined at least 25 mineralized roll fronts.
Pine Ridge spans about 39,390 acres, with mineralization typically at 200-400 meters depth, consistent with potential future in-situ recovery development.
2026 drilling campaign begins at Pine Ridge
Frontier Nuclear and Minerals launched a 2026 drilling campaign at its 100%-owned Pine Ridge uranium project in Wyoming’s Powder River Basin.
The program targets about 120 holes for 36,000 meters, using one rig from July to December, with a possible extension into January 2027.




