Greenland Mines began diamond drilling at the Skaergaard gold, palladium, platinum project in southeast Greenland as its 2026 field season moved into operations.
Support vessel Argus reached the site and mobilized equipment ashore, clearing the way for drilling and planned bulk sampling.
The program targets a Mineral Resource upgrade, bulk-sample work for metallurgical and engineering studies, and data collection for an initial assessment.
Initial drill holes are expected to be completed within days, with fieldwork planned over the next two months.