New Found Gold reports 23.66 g/t gold over 15.88 m in Queensway Lotto Zone channel samples
NFGC•Next steps for Queensway
An updated Queensway technical report with a revised mineral resource estimate is planned for H2 2026, and additional Lotto infill drilling is planned for H2 2026.
Work targeted PEA mine plan resource blocks
Work targeted Phase 2 open-pit and Phase 3 underground inferred resource blocks used in the 2025 PEA mine plan.
The company said 2025 program results aligned with the existing resource block model, and remaining 2025 assays outstanding are about 6%.
High-grade sampling and drilling at Queensway Lotto Zone
New Found Gold reported high-grade channel sampling and infill drilling at the Lotto Zone within its Queensway Gold Project in Newfoundland and Labrador.
Best channel result: 23.66 g/t gold over 15.88 m; top underground infill intercept: 43.52 g/t over 4.75 m.




