Pioneer Power Solutions wins order for two 1.2 MW PRYMUS generation systems
PPSI•Pioneer Power Solutions won an order for two 1.2 MW PRYMUS generation systems. The lease is set to begin in December 2026 and is expected to generate $700,000 in annual revenue; a decision on six additional systems is expected in early 2027.
1. Order details
Pioneer Power Solutions was awarded an order for two 1.2 MW PRYMUS generation systems. The lease is expected to commence in December 2026 and generate $700,000 in annual revenue. A decision on six additional PRYMUS systems is expected in early 2027.




