Schmid Group wins equipment order for South Asia glass substrate plant
SHMD•Schmid Group received an order for wet-process equipment for South Asia’s first glass core substrate manufacturing facility, designed to produce around 70,000 glass panels annually. The order will be recorded in fourth-quarter 2026 order intake.
1. Equipment order
Schmid Group received an order for wet-process equipment from a U.S.-based developer of glass-based advanced packaging. The equipment will support South Asia’s first glass core substrate manufacturing facility, designed to produce around 70,000 glass panels annually; the order will be recorded in fourth-quarter 2026 order intake.




