Willdan wins engineering work for 643 MW of energy infrastructure projects
WLDN•Willdan received limited notices to proceed for engineering and procurement on energy infrastructure projects totaling 643 MW, including work in California, Texas and Illinois.
1. Projects span three states
The work includes a transformer substation for a 100 MW data center in California; a 75 MW battery energy storage system and a substation for 300 MW of renewables in Texas; and substations for 88 MW and 80 MW of renewables in Illinois.




