Aduro Clean Tech posts 88.8%-90.8% condensable hydrocarbon yield in 75-hour NGP pilot run
ACT•75-hour NGP pilot run yields
Aduro reported 88.8% to 90.8% condensable hydrocarbon yield in a 75-hour NGP pilot campaign across changing PP/PE feed blends.
- Yield measured 88.8% on 100% PP
- Yield measured 90.8% on an 80:20 PP/PE blend
- Yield measured 89.2% on a 50:50 PP/PE blend
The September run processed 758 kg of polymer, with product-quality indicators consistent with prior campaigns. The system returned to target operating conditions about two hours sooner than a comparable prior run following process-condition changes.
NGP operating data are being used in Early Works engineering and procurement for the FOAK plant at Chemelot.




