Capstone Energy+ wins 2.6 MW power order for Argentina natural gas project
CPST•Capstone Energy+ received a 2.6 MW order for a remote natural gas compression plant in Argentina’s Río Negro Province. The shipment includes three gas turbines, with commissioning expected in August 2027.
1. Order details
The order covers two C1000S gas turbines and one C600S turbine to provide prime power for compression supporting an LNG export facility. The systems are designed for off-grid operation at a site without utility power lines.




