Cosa Resources reports summer drilling results at Murphy Lake North uranium joint venture with Denison Mines - DNN News | RalliesCosa Resources reports summer drilling results at Murphy Lake North uranium joint venture with Denison Mines
D
DNN• Summer drilling results at Murphy Lake North
- Cosa Resources released summer 2026 drilling results from the Murphy Lake North uranium joint venture with Denison Mines.
- The program drilled 13 holes for 6,752 meters across 650 meters of strike at the Cyclone trend; all holes hit structure or alteration.
- Elevated radioactivity was intersected in several holes, including up to 340 CPS over 0.5 meters; assays are pending.
- The company reiterated a winter highlight of 5 meters averaging 0.55% U3O8 in hole MLN26-013, including 0.5 meters at 1.7% U3O8.
- Cosa cited a treasury of C$16 million to fund follow-up drilling at Murphy Lake North, with a return planned in early 2027.
COLB
•