Fury Gold Mines Hits 12.50 g/t Au over 7.02 m Outside Block Model
Fury Gold Mines’ Phase 1 drilling at Eau Claire delivered a 12.50 g/t gold intercept over 7.02 m in hole 26EC-101 45 m down-plunge outside the current block model. Six of 21 holes returned significant results from 11,440 m drilled, including 3.92 g/t over 6.92 m in hole 26EC-097.
1. Phase 1 Drill Program Overview
Fury Gold Mines completed 21 drill holes totalling approximately 12,700 m in its Phase 1 Eau Claire program, with assay results received for 11,440 m. Six holes returned significant gold grades, targeting expansions along high-grade shoots and adding continuity to resources outside PEA-identified stopes.
2. Key Intercepts Outside Block Model
Infill hole 26EC-101 intersected 12.50 g/t gold over 7.02 m, located 45 m down-plunge from previous drilling outside the current block model, demonstrating resource growth potential. Drill hole 26EC-097 also delivered 3.92 g/t over 6.92 m, underscoring the potential for converting inferred ounces to the resource base.
3. Upcoming Phase 2 Drilling
Phase 2 drilling is under way with eight holes for 3,390 m completed, focusing on upgrading inferred portions to the Indicated category. The fully financed program will add 15,000–25,000 m of drilling through spring and summer 2026 to expand and de-risk the Eau Claire resource.