Jet.AI announces closed-loop cooling plan for StratGrid’s proposed Wheatland AI campus
JTAI•Jet.AI announced plans for closed-loop cooling at StratGrid’s proposed 240 MW off-grid campus in Alberta, using dry coolers and water from an existing industrial pipeline. Jet.AI holds an approximately 15% economic interest in the project through majority-owned SG Canada InvestCo.
1. Cooling and water plans
The proposed campus would use dry coolers rather than evaporative cooling towers, subject to final engineering and design. Water would come from an existing industrial raw water pipeline, not supplies allocated to agriculture or households.
2. Project status
Environmental assessments are underway ahead of an Alberta Utilities Commission application. Jet.AI holds an approximately 15% economic interest in the project through majority-owned SG Canada InvestCo.




