Turbo Energy brings 62.5 MWh of battery storage online across three Spanish industrial sites
TURB•Turbo Energy brought 62.5 MWh of battery storage into commercial operation at three Spanish industrial sites, as part of a $53 million contract covering 366 MWh across 10 factories.
1. Storage enters operation
The three sites pair 62.5 MWh of battery storage with 34 MWp of operating solar capacity under an AI-driven energy management platform. Turbo Energy delivered more than 130 MWh of systems in the first half of 2026, with remaining delivered capacity still being installed or commissioned. Since July 2026, operating installations have avoided 421 metric tons of CO₂, based on project operating data.




