Consolidated Water subsidiary PERC Water wins $39.8 million Pismo Beach water purification contract
CWCO•PERC Water, a subsidiary of Consolidated Water, won an approximately $39.8 million design-build contract for California’s Central Coast Blue water purification facility. The facility is planned to produce approximately 750 acre-feet of water annually, with construction expected to begin in spring 2027.
1. Project details
The City of Pismo Beach project aims to provide a drought-resistant local water supply and protect the groundwater basin from seawater intrusion. The design-build project is expected to take approximately 24 months.




